GreenYellow is pleased to present our solar rooftop project with Valeo, a leading automotive equipment supplier with a total installed capacity of 2 MWp and yearly green electricity production of up to 3 GWh.
With the ongoing concern of rising levels of carbon dioxide in the atmosphere, this solar project is expected to reduce the carbon dioxide emissions attributable to this factory by 1,300 tons per year, contributing to the 2050 net-zero target of the Valeo Group.